portfolio project

Company Projects

Dan Gote Calm Buoy Project

Client: Malaysia Marine & Heavy Engineering Sdn. Bhd.

Location: MMHE Pasir Gudang, Johor.

Scope:

Structural, Piping and Mechanical Works

Year: Nov 16 – Feb 18

Main Contractor: Malaysia Marine & Heavy Engineering Sdn. Bhd.

Host / Owner: SOFEC Inc

FPSO Cendor Phase 2

Client: Malaysia Marine & Heavy Engineering Sdn. Bhd.

Location: MMHE Pasir Gudang, Johor.

Scope: 

▶ Fabrication, Installation and Testing of Hull / Vessel Piping Systems in Cargo Tanks, Ballast Tanks, Pump Room, Fwd Pump Room and Main Deck
▶ Facbrication, Installation and Testing of Topside Piping System

Year: Dec 11 – May 14

Main Contractor: Malaysia Marine & Heavy Engineering Sdn. Bhd.

Host / Owner: MISC Berhad / Petrofac (M) Sdn. Bhd

PFLNG Turret

Client: Malaysia Marine & Heavy Engineering Sdn. Bhd.

Location: MMHE Pasir Gudang, Johor.

Scope: 

▶ Turret – Structural & Piping Works

Year: Oct 16 – June 17

Main Contractor: Malaysia Marine & Heavy Engineering Sdn. Bhd.

Host / Owner: SOFEC / Petronas Carigali

Malikai TLP Project

Client: Malaysia Marine & Heavy Engineering Sdn. Bhd.

Location: MMHE Pasir Gudang, Johor.

Scope: 

▶ Fabrication and Installation of Structural Columns and Pontoon

Year: Mar 15 – Jan 16

Main Contractor: Malaysia Marine & Heavy Engineering Sdn. Bhd.

Host / Owner: Sabah Shell Pretroleum Co. Ltd. / MISC

Panglima Power Major Outage Oct 2017 (HRSG)

Client: Panglima Power Sdn. Bhd.

Location: Telok Gong, Melaka.

Scope: 

▶ Conditions Assessment of Complete HRSG & BOP Piping
Supply, replacement of Hanger Supports

▶ Supply of Upgarded HP Desuperheater Spray Control Valve
(Final Stage) & Desuperheater Pipe Spool (P91 Material)

Year: Jan 17 – Nov 17

Main Contractor: HFS – GE Power System Korea.

Host / Owner: Edra Energy

Panglima 720MW CCGT Power Plant Melaka - 2 x HRSG Boiler

Client: Sukwon Idche (M) Sdn. Bhd.

Location: Telok Gong, Melaka.

Scope: 

▶ Complete Erection of HRSG Pressure & Non Pressure Part,
Piping & Supports Installation

Year: Jan 02 – Aug 02

Main Contractor: Doosan Heavy Industries Co.,Ltd.

Host / Owner: Siemens Power Generation

Malakoff

Malakoff Prai Power Plant - Major Outage Aug 2017 (HRSG)

Client: Malakoff Power Berhad.

Location: Prai, Penang.

Scope:

▶ Auxiliary Boiler Repair & Maintenance Works.

▶ Engineering, Procurement and Construction of HPHTSH
Semi Harps (Header + Tubes) Replacement

▶ Engineering, Procurement and Construction of HPSH Outlet Pipe
Relocation and Replacement Works.

▶ Supply, Replacement Work of HPSH Bellows

▶ Engineering, Procurement & Construction of HRSG Flow
Corrective Device (Modification to improve HRSG Inlet
Flow Profile)

Year: Nov 16 – Oct 17

Main Contractor: HFS – GE Power System Korea.

Host / Owner: Malakoff Power Berhad

Malakoff

Malakoff Prai Power Plant - Minor Outage Nov 18 (HRSG)

Scope:

▶ Engineering, Procurement and Replacement of Safety
Valve (HPEV119, HPSV191)
▶ Boiler Tube Repair & Replacement for Sampling.
▶ Conditions Assessment of Complete HRSG & BOP Piping
Supply, Replacement Work of Hanger Supports
▶ Auxiliary Boiler Repair & Maintenance Works
▶ CUI Inspection and Repair

Location : Prai, Penang

Year : Nov 18

Host / Owner : Malakoff Power Berhad

YTL

YTL Power Seraya - Major Outage Jan 18

Client: YTL Power Seraya Pte. Ltd.

Location: Jurong Island, Singapore.

Scope: 

▶ Engineering, Procurement and Construction of Condensate
Preheater (EC-PR3) Harp Replacement Works Unit 40
(6 Harps in Total)

▶ Conditions Assessment of Complete HRSG 40 & BOP Piping
Supply, Replacement Work of Hanger Supports for Unit 40

▶ Engineering, Procurement & Construction of HP Economizer
#4 & IP Evaporator Tube Replacement Works Unit 40
(261 Tubes in Total)

Year: Feb 17 – Aug 18

Main Contractor: HFS – GE Power System Korea.

Host / Owner: YTL Corporation

YTL

YTL Power Seraya - Cogen 30 Outage Jul 18 & Aug 18

Client: YTL Power Seraya Pte. Ltd.

Location: Jurong island, Singapore

Scope:  

▶ Engineering, Procurement and Construction of Condensate
Preheater (EC-PR3) Harp Replacement Works Unit 30
(6 Harps in Total)

▶ Conditions Assessment of Complete HRSG 30 Supply,
Replacement Work of Hanger Supports for Unit 30

▶ Engineering, Procurement & Construction of HP
Economizer#4 & IP Evaporator Tube Replacement
Works Unit 30(261 Tubes in Total)

Year : Jul 18 – Aug 18

Host/Owner : YTL Corporation

Panglima

Panglima Power Sdn Bhd

Scope:

▶ Supply of HP & RH Desuperheater Spray Control Valve

Location: Telok Gong, Melaka

Year:  2017, 2018, 2020

Host/Owner: Edra Energy

Panglima

Panglima Power Major Outage Nov 2019 (HRSG)

Scope:

▶ Supply, Replacement and Adjustment Works of HRSG Pipe
Hanger and Pipe Clamp

Location: Telok Gong, Melaka

Year:  Nov 19

Host / Owner : Edra Energy

Malakoff

Malakoff Prai Power Plant - Minor Outage Mar 19 (HRSG)

Scope: 

▶ Supply, Replacement Work of HTRH Pipe Bellows
▶ Boiler Tube Repair & Replacement for Sampling

Location: Prai, Penang

Year:  Mar 19

Host/Owner : Malakoff Power Berhad

FSO Sao Vang

FSO Sao Vang - External Turret

Scope:

▶ Fabrication and Erection of Multi-dicipline Works;
Structural, Piping and Mechanical

Structural, Piping and Mechanical

Location: MMHE Pasir Gudang, Johor

Year: May 19 – Mar 20

Host/Owner : Promor Pte. Ltd. / Malaysia Vietnam Offshore Terminal (MVOT)

Weight Info: 1340 MT

Bekok A & B

Bekok A & B Project

Scope:
▶ Structural, Piping & Mechanical (Multidicipline Package) og
2 nos of WHP Topside, Jacket and Bridge

Location: MMHE Pasir Gudang, Johor

Year:  Jan 20 – Jul 20

Host/Owner: Petronas Carigali

FSO Sao Vang

FSO Sao Vang - Vessel RLE & Conversion

Scope: 

▶ Repair Life Extension (RLE) & Coversion of Structural & Piping
Works, Forepeak Modification and Turret Integration Works

Location: MMHE Pasir Gudang, Johor

Year:  May 19 – Mar 20

Host/Owner:  Promor Pte. Ltd. / Malaysia Vietnam  Offshore Terminal (MVOT)

Weight Info:  800 MT

Malakoff

Malakoff Tanjung Bin Power Plant

Scope: 

▶ Design, Manufacture and Supply of Boiler Tube Shield

Location:  Tanjung Bin, Pontian, Johor

Year:  Sep 19

Host/Owner : Tanjung Bin Power Sdn Bhd.

Malakoff

Malakoff Prai Power Plant - Major Outage Jan 20 (HRPI)

Scope:
▶ CUI Inspection and Repair for HRSG, BOP
and Aux. Boiler

▶ Aux Boiler Furnance Refractory Repair

▶ Manhole and Platform Installation and Permanent
Support to Baffle Plate

▶ CRSV 191 Safety Valve Replacement

▶ Boiler Tube Repair and sampling

▶ Supply and modification for HTRH Pipe Support and
Hanger Support Adjustment Work

▶ HRSG Blowdown Tank & Aux Boiler Blowdown Tank
Internal Recoating

▶ Service Air Pipe Replacement

▶ To provide fabrication works for intake bar screen for
Prai Power Plant

▶ Supply, Fabricate and Replace/Install Cooling Water
Pump Lines

▶ ST & HRSG Thermowell Cutting, Boring & Re-Welding

▶ Supply, Fabricate and Replace/Install Fire Fighting
Water Lines and Instrument Air Lines

▶ HRSG Valve and Piping replacement

▶ Supply and Deliver Pipe & Fitting for CUI

Location:  Prai, Penang

Year:  Jan 20 – Mar 20

Host/Owner:  Malakoff Power Berhad

Backed by more than a decade of experience in providing the total Engineering, Procurement and Construction (hereinafter in referred to as "EPC") service for various industries, HFS Heavy Industries Sdn Bhd has come a long way to be recognized as a reputable industry player in Malaysia since establishment in 2003.

  • No. 11, Jalan Ekoperniagaan 1/29, Taman Ekoperniagaan, 81100 Johor Bahru, Johor Darul Takzim, Malaysia.

  • +607-871 1188

  • enquiry@hfsheavy.com