FPSO Cendor Phase 2

Featured Projects

---FPSO Cendor Phase 2---

FPSO Cendor

FPSO Cendor Phase 2

Client:

Malaysia Marine & Heavy Engineering Sdn. Bhd.

Location: 

MMHE Pasir Gudang, Johor.

Scope: 

Fabrication, Installation and Testing of Hull / Vessel Piping Systems in Cargo Tanks, Ballast Tanks, Pump Room, Fwd Pump Room and Main Deck Fabrication, Installation and Testing of Topside Piping System

Year: 

Dec 11 – May 14

Main Contractor: 

Malaysia Marine & Heavy Engineering Sdn. Bhd.

Host / Owner: 

MISC Berhad / Petrofac (M) Sdn. Bhd

Dia-inch Info:

-Vessel : 85000 DIA Inch

-Topside Piping: 110000 DIA Inch

Backed by more than a decade of experience in providing the total Engineering, Procurement and Construction (hereinafter in referred to as "EPC") service for various industries, HFS Heavy Industries Sdn Bhd has come a long way to be recognized as a reputable industry player in Malaysia since establishment in 2003.

  • No. 11, Jalan Ekoperniagaan 1/29, Taman Ekoperniagaan, 81100 Johor Bahru, Johor Darul Takzim, Malaysia.

  • +607-871 1188

  • enquiry@hfsheavy.com