Kasawari CPP Topside

CLIENT | Malaysia Marine & Heavy Engineering Sdn Bhd
LOCATION | MMHE Pasir Gudang, Johor
SCOPE | Piping Erection Works – Spools Installation, Testing and Resinatement Works of Varoius Piping Mat’l (CS,SS,DSS, CuNi)
65,00 Dia-Inch 250MT Pipe Support
YEAR | Mar 21 - Aug 23
MAIN CONTRACTOR | Malaysia Marine & Heavy Engineering Sdn Bhd
HOST / OWNER | Petronas Carigali

Rosmari Marjoram Fixed Offshore Platform

CLIENT | Malaysia Marine & Heavy Engineering Sdn Bhd
LOCATION | MMHE Pasir Gudang, Johor
SCOPE | Fabrication and Assembly of Topside Structure and Mechanical Installation Works
Steel Works – 1,300 MT
YEAR | Jan 23 - Mar 23
MAIN CONTRACTOR | Malaysia Marine & Heavy Engineering Sdn Bhd
HOST / OWNER | Sarawak Shell

FPSO – Cendor 2

CLIENT | Malaysia Marine & Heavy Engineering Sdn Bhd
LOCATION | MMHE Pasir Gudang, Johor
SCOPE | Fabrication, Installation and Testing of Hull/ Vessel Piping Systems in Cargo Tanks, Ballast Tanks, Pump Room, Fwd Pump Room and Main Deck
Fabrication, Installation and Testing of Topside Piping System
YEAR | Dec 11 - May 14
MAIN CONTRACTOR | Malaysia Marine & Heavy Engineering Sdn Bhd
HOST / OWNER | MISC Berhad/ Petrofac (M) Sdn Bhd

PFLNG Turret

CLIENT | Malaysia Marine & Heavy Engineering Sdn Bhd
LOCATION | MMHE Pasir Gudang, Johor
SCOPE | Turret - Structural & Piping Works
Weight info - 2800MT
YEAR | Oct 16 - Jun 17
MAIN CONTRACTOR | Malaysia Marine & Heavy Engineering Sdn Bhd
HOST / OWNER | SOFEC/ Petronas & Carigali

Dan Gote Calm Buoy

CLIENT | Malaysia Marine & Heavy Engineering Sdn Bhd
LOCATION | MMHE Pasir Gudang, Johor
SCOPE | Structural, Piping and Mechanical Works
Weight info - 1200MT
YEAR | Nov 16 - Feb 18
MAIN CONTRACTOR | Malaysia Marine & Heavy Engineering Sdn Bhd
HOST / OWNER | SOFEC Inc

YTL Power Seraya – Cogen 30 & 40 Major Outage Jan 18 & July 18

CLIENT | YTL Corporation
LOCATION | Jurong Island, Singapore
SCOPE | Engineering, Procurement and Construction of Condenstae Preheater (EC-PR3) Harp Replacement Works Unit 30 & 40 (12 Harps in Total) c/w pressure testing witnessed by Ministry of Manpower Singapore.
YEAR | Feb 17 - Aug 18
MAIN CONTRACTOR | HFS - GE Power System Korea
HOST / OWNER | YTL Corporation

Malakoff Prai Power Plant – Major Outage Aug 2017

CLIENT | Malakoff Power Berhad
LOCATION | Prai, Penang
SCOPE | Auxiliary Boiler Repair & Maintenance Works
Engineering, Procurement and Construction of HPHTSH Semi Harps Replacement c/w pressure testing and witnessed by DOSH
YEAR | Nov 16 - Oct 17
MAIN CONTRACTOR | HFS - GE Power System Korea
HOST / OWNER | Malakoff Power Berhad

Tuanku Ja’afar Power Station

CLIENT | TNB Power Generation Sdn Bhd
LOCATION | Port Dickson, Negeri Sembilan
SCOPE | PD2 HRH Main Steam Stop Valve Seat Crack Repair
YEAR | Dec 21
MAIN CONTRACTOR | Asman Kadir Engineering & Fabrication Sdn
HOST / OWNER | TNB Power Generation Sdn Bhd